SinoTrack
SinoTrack 4G GPS Tracker for Vehicles, ST-901L LTE Mini GPS Tracker Waterproof Locator Real-Time Location Device for Car Motorcycle Truck Taxi with No Monthly Fee Tracking System
SinoTrack 4G GPS Tracker for Vehicles, ST-901L LTE Mini GPS Tracker Waterproof Locator Real-Time Location Device for Car Motorcycle Truck Taxi with No Monthly Fee Tracking System
Couldn't load pickup availability
Overview
- Brand : SinoTrack
- Special Feature : Waterproof,Cut Engine Off,Real Time Tracking, Alert Notification, Geo-Fence, History Route Playback, Rechargeabl Waterproof,Cut Engine Off,Real Time Tracking, Alert Notification, Geo-Fence, History Route Playback, Rechargeabl
- Connectivity Technology : Cellular
- Supported Application : SinoTrackPRO
- Specific Uses For Product : for gps tracker car,car alarms,car Anti Lost Alarm tracker
About this item
- 【Cut Engine Remotely】4G gps tracker include relay, when you found your car was stolen, you can control your car remotely on your phone, cut the engine by sending SMS command, the vehicle will stop move until it received your SMS command “9400000”, prevent theft of your car on the parking lot.(the car running below to 20KM/h will stop within 10-20sec when it get sms command)
- 【MAIN FUNCTION & 4G NETWORK】SinoTrack mini car gps tracker for Motorbike, Built-in WCDMA, GSM and GPS double antennas with ACC to detect ignition.(SIM Card Not Include). ST-901L 4G(2G+4G)GPS tracker for vehicles, very simple and easy to use for Motorcycle, Truck, Taxi, etc.Text message alerts for movement, speeding, leaving or entering areas, low battery,Shocking, driving reports historical data saved during service. Real time gps vehicle tracker built-in backup battery
- 【SUPPORT TRACKING PLATFORM LIFETIME】Waterproof gps tracker for cars with online tracking service subscription. Buy a SIM card for the device (this GPS locator not include a SIM card, you need to buy another one), search sinotrackpro login or download Sinotrack Pro GPS APP from your tablet, pc or phone lifetime. Real-time tracking is available at no additional cost
- 【REAL TIME TRACKING】Real-time car GPS tracker ST-901L 4g gps tracker for vehicles hidden Locator based on LTE, GSM , GPRS network and GPS satellites ,locating and monitoring remote targets with our own GPS tracking APP or web, which display of location information accurately ( Positioning accuracy up to 10 meters )
- 【HISTORY MEMORY】Sinotrack 4g gps tracker for motorcycles,car,truck and taxi can save 2 years of tracking history. Sinotrack gps tracker no monthly fee with 2 time interval,You can view and play back your daily tracking history,and when the car goes to a place,you can make a clearer judgment.Attention Please:we recommend SpeedTalk SIM card,don't use T-mobile
Share

Collections
-
Car Electronics
Upgrade your driving experience with RideRevamp’s Car Electronics collection, where cutting-edge technology...
-
Computer Accessories & Peripherals
Elevate your tech setup with RideRevamp’s curated collection of computer accessories and...
-
Deflectors & Shields
Elevate your vehicle’s style and protection with RideRevamp’s Deflectors & Shields collection,...
-
Garage Storage
Transform your workspace with RideRevamp’s Garage Storage collection, designed to bring premium...
-
Floor Mats & Cargo Liners
Elevate your vehicle’s interior with RideRevamp’s premium Floor Mats & Cargo Liners,...
-
Lighting & Electrical
Illuminate your drive with RideRevamp’s Lighting & Electrical collection, designed to elevate...
Blog posts
-
5 Essential Car Care Accessories Every Driver S...
As a car owner, you know that keeping your vehicle in top shape is crucial not only for its performance but also for your safety on the road. While regular...
5 Essential Car Care Accessories Every Driver S...
As a car owner, you know that keeping your vehicle in top shape is crucial not only for its performance but also for your safety on the road. While regular...
-
Revamp Your Ride: Affordable Interior Upgrades ...
As a car enthusiast, I'm always on the lookout for ways to breathe new life into my ride. And one of the easiest and most affordable ways to do that?...
Revamp Your Ride: Affordable Interior Upgrades ...
As a car enthusiast, I'm always on the lookout for ways to breathe new life into my ride. And one of the easiest and most affordable ways to do that?...
-
Top 10 Must-Have Car Accessories to Revamp Your...
It's that time of year again when we start thinking about ways to spruce up our rides and make them stand out from the crowd. Whether you're looking to add...
Top 10 Must-Have Car Accessories to Revamp Your...
It's that time of year again when we start thinking about ways to spruce up our rides and make them stand out from the crowd. Whether you're looking to add...